| |
|
| The
former Michiganensian office and the future office suite.
The General Manager’s office will be in the corner where
Stacy, the general contractor’s project manager is on
the phone. |
The
new board room which will be located on the 1st floor. Note
the barrel lights in the ceiling. There will also be a small
kitchenette at one end of the room. |
| |
|
| The
LU/LA (elevator) entrance in the second floor lobby. |
The
Daily News Room. New ceiling, new lighting, new fans, same
windows. |
| |
|
| Cabinets
where the entrance to the batcave used to be located. |
A
new conference room replaces the former board office. |
| |
|
| Another
conference room has been constructed where Sports and Photo
used to be located in the main newsroom area. |
The
former back stairs are gone since they did not meet the building
code, but it provides a better view out the southern window.
The railings are being reused as decorations. |
| |
|
| A
new fire-rated rear stairway is located where the business
senior staff office was. The colored panels will be used for
displaying awards and memorabilia. |
Inside
the larger news conference room. The windows are a tighter
fit so we won’t feel the wind blowing. |
| |
|
| New
restroom tile, colored to match the wall tiles. |
More
floor tiles |
| |
|
| The
aisle to the second floor restrooms which replace the general
manager’s office. |
The
Gargoyle office has moved to the second floor. We need to
replace the Gargoyle head in the glass panel. |
| |
|
| The
monumental stairway at the entrance to the building. Note
that the worn steps have been replaced. |
First
floor lobby with the LU/LA (elevator) entrance and stairway
to the second floor. |
| |
|
| The
second floor landing. To the left is the Daily Newsroom. To
the right are the Gargoyle and Michiganensian offices. |
Another
view of the second floor landing. The door next to the LU/LA
leads to a mechanical room. |
|
|
| |
|
| One
of the first floor windows waiting for new sashes. |
First
floor Daily business office. This is the entry counter where
customers will be served. |
| |
|
| The
new board office. The lower window accommodates customers
in wheelchairs. |
The
view of the business office from the board office hallway. |
| |
|
| The
rear of the business office counters. These will have file
space added. |
Another
view of the rear of the counters. |
| |
|
| The
view from inside the board office over the counter. |
Another
view from inside the board office. |
| |
|
| The
computer room, server closet and telecomm room. |
Sam
Offen, Student Publications General Manager, and Lisa Reiher,
Project Architect, at the board office windows. Note the window
sashes on the floor ready for staining and installation |
| |
|
| Another
view of the board office. |
|